/ / Openwork Vest with knitting needles

Openwork vest knitted

Openwork vest knitted

Openwork vest knitted

Openwork waistcoat with cotton knitting needles

This waistcoat is knitted with knitting yarns of bright color, with an openwork pattern.
The model is executed without buttons and buttons. It can be worn as with a blouse and jeans, and over the dress.

The size: XS-S (M-L, XL)
Bust: 71-86 (91-106, 111-116)
Ultimate breast circumference: 108 (133, 156)
Length: 53.5 (57.5, 61.5)
Materials: 12 (16, 18) skeins of Schachenmayr SMC Catania Grande yarn (100% cotton, 50 g / 63 m.), Color 3282, knitted waistcoat vests 5.0 mm. (Straight and circular spokes, the length of the circular spokes is 80 cm).
Knitting density: 17.5 loops * 17 rows = 10 * 10 cm.

Elastic: (2 persons, 2 of us) along the series. Repeat this row for gum.
Wrong surface: Purl on the front side and facial on the wrong side.
Openwork pattern: Knit by the scheme, the scheme is represented only from the front side.
All purl rows knit like looking loops.
Nakidae to sew with purl loops.
Knit rows 1-2 - once, then repeat rows 3-10 for the openwork pattern.

Openwork waistcoat with knitting needles, description:

Back: Straight knitting needles 5.0 mm. Dial 107 (128, 149) loops.
Knit 3 rows with the wrong side, starting from the wrong side.
4th row (side): 1 persons, knit the first row of the scheme, 1 persons.
Continue to knit according to the pattern with 1 edge loop on each side.
Rows of 1-2 schemes to execute once, then repeat 3-10 rows - 8 (9, 10) times.
Knit 1-10 rows of the scheme.
Track. Row (face side): 44 (55, 65) loops tie in a pattern and lay them on an additional spoke, close the central 19 (18, 19) hinges for the neck, knit the last 44 (55, 65) loops in the pattern.

Left shelf: = 44 (55, 65) loops.
Knit the purl series in the pattern.
Only for size XS-S (face side): 1 persons., Knit 2 rapport schemes, 1 persons.
Only for size M-L (face side): 1 persons., 2 together persons. Behind the back wall, knit with 12th to 21st loop circuit, knit 2 rapport schemes, 1 persons.
Only for size XL (face side): 1 persons., Knit 3 rapport schemes, 1 persons.
Continue to perform 3-10 rows of the scheme - 8 (9, 10) times.
Knit 1-8 rows of the scheme - once.
Knit 2 rows of purl.
Close the hinges with the front.

Right shelf: Return to the delayed loops = 44 (55, 65) loops.
Only for size XS-S (face side): 1 persons., Knit 2 rapport schemes, 1 persons.
Only for size M-L (face side): 1 persons., Knit 2 rapports of the scheme, knit with the 1st to 10th loop of the scheme, 2 together faces., 1 persons.
Only for size XL (face side): 1 persons., Knit 3 rapport schemes, 1 persons.
Continue to perform 3-10 rows of the scheme - 8 (9, 10) times.
Knit 1-8 rows of the scheme - once.
Knit 2 rows of purl.
Close the hinges with the front.

Strapping the floodplains: With no. Side to dial 80 (96, 112) loops along 39 (47, 55) see the left armhair (in the center closed hinge loops).
Track. Number (persons side): 3 persons, (2 persons, 2 persons.) Repeat to the last loop, 1 persons.
Track. Row: 3 out of the way, (2 faces., 2 out.) Repeat from * to the last loop, 1 out.
Next, perform the shortened series
1st shortened row (face side): 60 (76, 92) loops with an elastic band, turn (there are 20 loops not knitted), make a cape.
2nd shortened row: 40 (56, 72) loops with an elastic band, turn (there are 20 loops left unbonded), make a cape.
Next, we knit another 9 shortened rows, tying each time 4 loops more.
Attention! Nakis knit together into a pattern with the next loop.
3rd shortened row: 44 (60, 76) loops with rubber band, turn, cape.
4th shortened row: 48 (64, 80) loops with rubber band, turn, cape.
5th shortened row: 52 (68, 84) loops with rubber band, turn, cape.
6th shortened row: 56 (72, 88) loops with rubber band, turn, cape.
7th shortened row: 60 (76, 92) loops with rubber band, turn, cape.
8th shortened row: 64 (80, 96) loops with rubber band, turn, cape.
9th shortened row: 68 (84, 100) loops with rubber band, turn, cape.
10th shortened row: 72 (88, 104) loops with rubber band, turn, cape.
11th shortened row (face side): knit with an elastic band to the end of the row.
12th row: knit an elastic band on all hinges = 80 (96, 112) hinges.
Close the loop with an elastic band.
Repeat for right armhole.
Sew the sides.

Shelves: With circular spokes 5.0 mm., On the front side, dial 108 (117, 124) loops along the right shelf, 19 (18, 190 loops along the neck and 109 (117, 125) loops along the left shelf = 236 (252, 268) loops.
1st row (out side): 3 out of the way (2 persons, 2 notches) repeat to the last loop, 1 out.
2nd row: 3 persons. (2 dep., 2 persons.) Repeat to the last loop, 1 persons.
Repeat rows 1 and 2 one more time.
5th row: knit an elastic band over the first 80 (84, 92) loops, turn, put off the remaining loops
Knit an elastic band for another 13 rows.
Close the loop with an elastic band.
Repeat for the left (80, 84, 92) hinges of the left bar.

Collar: = Central 76 (84, 84) loops.
Knit an elastic band on these loops - 20 rows.
Close the loop with an elastic band.

Note! The number of loops along the knitting pattern changes! After the 7th row - decreases by 2 loops, after the 9th row - returns to the previous number.
Total = 21 loop according to the scheme.

Place text on other sites - it's forbidden!

Openwork vest knitting pattern

Pay attention to: